Lower Wheel Creek Repairs

Construction is underway!

The Lower Wheel Creek Stream Restoration was completed in 2009. 

This year, we are constructing a repair to this restoration to replace failing structures that are no longer functioning as intended and to stabilize embankments. This is part of an adaptive management strategy that includes monitoring our projects and repairing them as needed.

Construction Photos (December 2025)

Image (4)

Post-Construction Photos (2009)

IMG_0346

Pre-Construction Photos

WHEEL CREEK 041

Repair Design Plans (100%)

Lower Wheel Creek Title